Mountain View Corridor, UDOT
Infinity Consultants provided UDOT with hydrologic design calculations for the engineering of storm water conveyance from mountain watersheds across a proposed six-lane divided highway. We specified steep culverting energy dissipation techniques. We accommodated as much as 300 cfs along a three-mile portion of the highway.