Western Zirconium Subsurface Barrier Wall

Infinity Consultants provided complete materials testing, mix design testing, and quality control monitoring for the following activities on a 2-mile-long subsurface barrier wall, work pad, and containment dike: construction of 3.5-foot-thick work pad soil mixing, 1.5-foot thick structural fill placement, 40-foot-deep slurry wall, and 5-foot-thick dike fill. We also provided testing for crusher material compliance for on-site rock quarry operations. An AASHTO accredited mobile soils laboratory was provided and operated by Infinity Consultants. Infinity also performed precondition, construction layout control, and as-built surveying services.