Westlake (Pelican Point South)
Mining plan and DOGM permitting were provided for this open pit. Site planning and design of materials washing and slurry conveyance and disposal were engineered. UDOT-approved entrance, erosion control, storm drainage, power supply, and water supply were each included in the design. Reclamation grading and treatments were also provided.